Concrete Volume Calculator

Work out the volume of concrete needed for a rectangular pour, with an allowance for wastage.

Formula

Volume = Length × Width × Thickness, then multiplied by (1 + wastage ÷ 100).

  1. Net volume (m³) = L (m) × W (m) × T (m)
  2. Total volume (m³) = Net volume × (1 + wastage % ÷ 100)

Worked example

A driveway slab 5 m long, 4 m wide and 150 mm thick, with 5% wastage.

  1. Convert the thickness: 150 mm = 0.15 m
  2. Net volume = 5 × 4 × 0.15 = 3.00 m³
  3. Wastage = 3.00 × 0.05 = 0.15 m³
  4. Total = 3.00 + 0.15 = 3.15 m³

Order 3.15 m³, which in practice means booking 3.5 m³ from the plant.

Assumptions and limitations

  • The pour is a plain rectangular prism of constant thickness. Steps, thickenings, downstands and haunches must be calculated separately and added.
  • No deduction is made for reinforcement. Rebar displaces well under 2% of the volume in normal slabs and is conventionally ignored.
  • Wastage is a planning allowance, not a guarantee. Actual loss depends on ground conditions, formwork and placing method.

What this calculator does not do

  • Does not design the pour. Thickness, grade, reinforcement and joint layout are design decisions taken elsewhere.
  • Does not handle irregular shapes, falls or tapers. Break the pour into rectangular parts and add them.
  • Does not size a delivery schedule. Truck capacity, pour rate and the number of loads depend on your supplier and your placing method.

Practical tips

Frequently asked questions

How many cubic metres of concrete do I need for a slab?

Multiply length by width by thickness in metres. A 5 m × 4 m slab at 150 mm thick needs 3 m³ before wastage. Convert the thickness from millimetres to metres first — this is the most common mistake.

How much wastage should I allow for concrete?

Between 5% and 10% for most slabs on prepared ground. Go higher for footings poured against uneven excavation, where the sides can over-break significantly.

Does this calculator work in cubic yards?

Yes. Switch the result unit to yd³, or set the input units to feet and inches. 1 m³ is about 1.308 yd³.

Should I subtract the volume taken up by rebar?

No. Reinforcement typically occupies 1–2% of a slab volume, which is well inside the wastage allowance, so it is standard practice to ignore it.

Related calculators

All concrete calculators

Estimating tool, not a design. This calculator works out quantities from the dimensions you enter. It does not size any structural member, verify a design, or confirm compliance with any building code. Check every result against your project specification and applicable local standards, and involve a qualified engineer where the work requires one.