Guides
How these quantities are worked out in practice, what the numbers mean, and what goes wrong on site. Written from road construction QA/QC experience rather than from textbooks.
-
How to calculate asphalt tonnage on site
Volume, density, wastage — and the three mistakes that turn a correct formula into a wrong order.
-
Tack coat: application rates and what residual binder actually means
If you do not know whether your specified rate is sprayed or residual, you can be out by a factor of two.
-
Prime coat on granular base: rates, blinding sand, and when it is skipped
A prime coat that sits on top of the base instead of soaking into it has done nothing.
-
Field density testing: nuclear gauge, sand cone and cores
Three methods, three different jobs. The disputes happen when someone treats them as interchangeable.
-
Why asphalt cores fail density, and what to do about it
Most failed cores are a temperature problem wearing a different costume.
-
Reading a sieve analysis and spotting a failing gradation
The curve tells you what the pavement will do long before the pavement does it.
-
Bulking, swell and shrinkage: three factors people confuse
The same soil has three different volumes. Order against the wrong one and the job stops.
-
Rebar spacing: maximum spacing versus what gets tied on site
The right number of bars in the bay does not mean every gap is legal.
-
Ordering ready-mix concrete: quantity, wastage and what turns up
The drawing quantity and the delivered quantity are never the same number. Plan for the difference.
-
Trench excavation and backfill quantities
Four separate volumes, three of which people forget to separate.